The New England transmission grid has hit the limit for the amount of power it can transfer between Southeastern Massachusetts and the high-electric-use area in and around Boston. Instead of expensive and difficult to-site and overland construction connections, Anbaric’s Mystic Reliability Wind Link™ solves this significant regional transmission issue by bringing clean offshore wind power from Southeast Massachusetts directly to Greater Boston.

The Mystic Reliability Wind Link™:

  • Repurpose old power plant sites to support clean, renewable energy
  • Build the infrastructure needed for fast and efficient expansion of offshore wind power
  • Strengthen Greater Boston’s electricity grid
  • Minimize onshore disruptions

 

 

On-shore transmission upgrades identified by ISO New England for wind injections above 5,800 MW:

Source: 2019 Economic Study Offshore Wind Transmission Interconnection Analysis