The New England transmission grid has hit the limit for the amount of power it can transfer between Southeastern Massachusetts and the high-electric-use area in and around Boston. Instead of expensive and difficult to-site and overland construction connections, Anbaric’s Mystic Reliability Wind Link™ solves this significant regional transmission issue by bringing clean offshore wind power from Southeast Massachusetts directly to Greater Boston.
The Mystic Reliability Wind Link™:
- Repurpose old power plant sites to support clean, renewable energy
- Build the infrastructure needed for fast and efficient expansion of offshore wind power
- Strengthen Greater Boston’s electricity grid
- Minimize onshore disruptions